Trail Detail

Green Bay, WI
5.4m
Asphalt
[ NWS ]
New Reports Report Requests

Notes

This trail is wide, relatively new (2 years since paved), mostly smooth and flat. Limited chipstone and sticks except in the fall when the leaves fall and then it can be a little more challenging. Total length of pavement is about 5+ miles with very few road crossings. It can a little get busy on the weekends. Access from multiple points from Riverside drive on the east side of the river. The trail itself continues south across Heritage road in DePere to Wrightstown as a gravel road bed. This is another 10 miles or so. I have never skied that but have been told Aero's can manage the surface (and provide a good resistance workout). (Submitted by Scott Putman)
Proximity
Search
Ski Trails Rollerski Trails Stores Lodging
Within    

Trail Reports

No reports found.